Concorde Place Shared Facilities 5 and 7 Concorde Park Place, Toronto

HomeCompleted ProjectsConcorde Place Shared Facilities 5 and 7 Concorde Park Place, Toronto

Two 38 storey residential condominiums & recreation center

High Efficiency Boilers

Variable Frequency Drives

KVAR Energy Controllers

  • Design and manufacture of 1,100 heat pumps
  • Removal and installation of 1,100 new heat pump units

Energy conservation retrofits in buildings 5 and 7

Our work consisted of:

  • Complete boiler plant re-design and retrofit from atmospheric to high efficiency boilers
  • All heating and domestic piping
  • Installation of Building Automation System
  • Supply and install two new Make Up Air units by way of helicopter
  • Supply and install KVAR® EC power conditioning devices on inductive loads
  • Supply and installation of Domestic Cold Water Booster Pumps System VFD controlled

Energy conservation retrofit in recreation centre

Our work consisted of:

  • Installation of new high efficiency boilers
  • Installation of titanium heat exchangers
  • Installation of Building Automation System

Procurement of the incentives on behalf of the client