Convention Centre consisting of five separate convention and banquet areas, and three indoor soccer fields.
New construction
Our work consisted of complete HVAC to include:
- All sheet metal fabrication and installation
- Installation of 650 tons of cooling, (63 rooftop units)
- Five Make-up Air Units (15 – 75 tons)
- Complete installation of five commercial kitchens including hanging 30ft of stainless steel hoods and welded ductwork
- Carbon Monoxide Monitoring System for underground parking
- All HVAC Control Systems